24/799,98%SLA

Join

our network of failsafe datacenters in Moscow and St. Petersburg, that can accomodate equipment of any capacity on its premises
13400 m 2
total area
17 MW
total power capacity
Tier 3
quality level

Complies with international
ISO 27001 information security standards

Quality management
system complies with
ISO 9001 standard
DC Moscow and
St. Petersburg are
PCI DSS certified
Linxdatacenter
Moscow, Russia
  • 4400 m 2
  • 5 MW
  • TIER III | TIER II
  • PoP's MSK IX
  • Address
    8 Marta 14 bld.1, Moscow, Russia
  • Area, sq.m
    4400
  • Power capacity, Mwatt
    5
  • Quality level
    TIER III | TIER II
  • Certification
    ISO 27001; ISO 9001; PCI DSS; certification for compliance with Federal Service for Technical and Export Control (FSTEC) requirements for personal data storage
  • Number of external power supply input terminals
    2 city input terminals from each transformer substation
  • Backup power supply
    FG Wilson diesel generator set
  • Main cooling system
    double-circuit, with chillers, precision air conditioners and free cooling
  • Backup cooling system
    2N and N+1 backup system
  • Management and dispatching system
    BMS Beckhoff
  • Security system
    6 access levels; video surveillance system; ACS; additional customer security circuits; biometric access control system; security service with regular guard tours around the facility
  • Connectivity
    the largest communication center М8 is placed at DC; own optical routes to M9 and M1; connection point to MSK-IX; over 40 communications providers
  • Virtual tour
    Virtual tour
  • Video about DC
    Video about DC
  • Material about DC
  • Partner
Linxdatacenter
St. Petersburg, Russia
  • 9000 m 2
  • 12 MW
  • TIER III | TIER II
  • PoP's SPB IX
  • Address
    Russia, St.Petersburg, Repischeva 20a
  • Area, sq.m
    9000
  • Power capacity, Mwatt
    12
  • Quality level
    TIER III | TIER II
  • Certification
    ISO 27001; ISO 9001; PCI DSS; certification for compliance with Federal Service for Technical and Export Control (FSTEC) requirements for personal data storage; Uptime Institute Management & Operations Stamp of Approval
  • Number of external power supply input terminals
    2 input terminals from the gas generator station; 1 city input terminal to the gas generator station; 2 input terminals from diesel generator sets
  • Backup power supply
    3 Cummins diesel generator sets
  • Main cooling system
    double-circuit, with chillers, precision air conditioners and free cooling
  • Backup cooling system
    2N and N+1 backup system
  • Management and dispatching system
    BMS Schneider Electric StruxureWare
  • Security system
    6 access levels; video surveillance system; ACS; additional customer security circuits; biometric access control system; security service with regular guard tours around the facility
  • Connectivity
    direct connection to SPB-IX; over 15 communications providers; 2 independent optical routes to Internet exchange points
  • Virtual tour
    Virtual tour
  • Video about DC
  • Material about DC
  • Partner

Partner facilities

Warsaw, Poland
  • 1400 m 2
  • 2,5 MW
  • TIER III | TIER II
  • PoP's LIM
  • Address
    Al. Jerozolimskie 91, 02-001
  • Area, sq.m
    1400
  • Power capacity, Mwatt
    2,5
  • Quality level
    TIER III | TIER II
  • Certification
    ISO 27001; ISO 9001; PCI DSS
  • Number of external power supply input terminals
    2 city input terminals
  • Backup power supply
    3 diesel generator sets
  • Main cooling system
    double-circuit, with chillers, precision air conditioners and free cooling
  • Backup cooling system
    N+1
  • Management and dispatching system
    BMS TAC – Vista Schneider
  • Security system
    6 access levels; video surveillance system; ACS; additional customer security circuits; biometric access control system; security service with regular guard tours around the facility
  • Connectivity
    over 10 communications providers; direct connection to major European Internet exchange points
  • Virtual tour
  • Video about DC
  • Material about DC
  • Partner
    Да

Result is guaranteed by

Andrey Perekrest
Andrey Perekrest
Head of Linxdatacenter DC Moscow
We guarantee that operation of our DC will be not only uninterrupted, but also comfortable for our Customers. Our operational team ensures all necessary conditions on a daily basis and always aims to achieve the maximum result.
Taras Chirkov
Taras Chirkov
Head of Linxdatacenter DC St. Petersburg
We strive to provide not only failsafe information infrastructure, but also reliable physical security systems. Our DC is equipped with high-end identification and access control devices that guarantee equipment protection from criminals.
Request a test drive of HyperCloud solution based on
Cisco HyperFlex

Get our offer for colocation in DC Linxdatacenter

or call us +7 495 369-05-94 


* Required fields

We are ready to help you

Svetlava Yakovleva
Svetlava Yakovleva
Commercial Director
Linxdatacenter St. Petersburg
Our aim is to establish long-term cooperation with our customers, become their reliable partner, who can be entrusted with valuable data and business-critical processes.
Anton Antonov
Anton Antonov
Sales Director
Linxdatacenter Moscow
We always strive to find an optimal solution for each customer that would ideally suit their business needs and guarantee smooth operation and data protection.

to top